Traducción - Turco-Inglés - mekanik tesisat proje ön raporuEstado actual Traducción
Este texto está disponible en los siguientes idiomas:  
Categoría Explicaciones | mekanik tesisat proje ön raporu | | Idioma de origen: Turco
Bulgaristan’ın Lovech şehrinde yapılması planlanan (yapımı devam eden) Atık su Arıtma Tesisinin İdari Bina, Bekçi Odası, Pompa İstasyonu, İnce Izgara Binası, Blower Odası, Çamur Susuzlaştırma Binası ile MCC Binasının ısıtma, havalandırma ve sıhhi tesisatlarının dizaynları aşağıda belirtilmiştir. Hesap raporlarının hazırlanabilmesi için Lovech şehrinin dizayn şartlarının eksiksiz olarak bildirilmesi gerekmektedir. |
|
| Initial Report for Mechanic Facility Project | | Idioma de destino: Inglés
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below.
Design requisites shall be submitted in full for the financial reports to be made ready.
| Nota acerca de la traducción | Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below
Design requisites shall be submitted in full for the financial reports to be made ready |
|
Última validación o corrección por dramati - 22 Diciembre 2007 15:16
Último mensaje | | | | | 20 Diciembre 2007 14:55 | |  smyCantidad de envíos: 2481 | dramati, the translation should be the following way:
---------
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below
Design requisites shall be submitted in full for the financial reports to be made ready
-------
CC: dramati | | | 20 Diciembre 2007 16:18 | | | lovech city is not mentioned in the last paragraph. | | | 21 Diciembre 2007 09:27 | |  smyCantidad de envíos: 2481 | yes it is mentioned sirinler, but I think it needs to be edited one more time dramati the way follows:
...the Refinement Facility for Waste Water which is being planned to be built (and whose construction is ongoing) in Lovech City, Bulgaria, | | | 21 Diciembre 2007 09:56 | |  smyCantidad de envíos: 2481 | forgot to cc, dramati please see above: CC: dramati | | | 21 Diciembre 2007 16:07 | |  smyCantidad de envíos: 2481 | dramati, could you have a look at here one more time please? CC: dramati |
|
| |
|