Bulgaristan’ın Lovech şehrinde yapılması planlanan (yapımı devam eden) Atık su Arıtma Tesisinin İdari Bina, Bekçi Odası, Pompa İstasyonu, İnce Izgara Binası, Blower Odası, Çamur Susuzlaştırma Binası ile MCC Binasının ısıtma, havalandırma ve sıhhi tesisatlarının dizaynları aşağıda belirtilmiştir. Hesap raporlarının hazırlanabilmesi için Lovech şehrinin dizayn şartlarının eksiksiz olarak bildirilmesi gerekmektedir.

Kichwa
Initial Report for Mechanic Facility Project
Tafsiri
Kiingereza

Ilitafsiriwa na turkuazam
Lugha inayolengwa: Kiingereza

Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below.

Design requisites shall be submitted in full for the financial reports to be made ready.
Maelezo kwa mfasiri
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below

Design requisites shall be submitted in full for the financial reports to be made ready
Ilisahihishwa au kuhaririwa mwisho na dramati - 22 Disemba 2007 15:16





Ujumbe wa hivi karibuni

Mwandishi
Ujumbe

20 Disemba 2007 14:55

smy
Idadi ya ujumbe: 2481
dramati, the translation should be the following way:
---------
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below

Design requisites shall be submitted in full for the financial reports to be made ready
-------

CC: dramati

20 Disemba 2007 16:18

sirinler
Idadi ya ujumbe: 134
lovech city is not mentioned in the last paragraph.

21 Disemba 2007 09:27

smy
Idadi ya ujumbe: 2481
yes it is mentioned sirinler, but I think it needs to be edited one more time dramati the way follows:

...the Refinement Facility for Waste Water which is being planned to be built (and whose construction is ongoing) in Lovech City, Bulgaria,

21 Disemba 2007 09:56

smy
Idadi ya ujumbe: 2481
forgot to cc, dramati please see above:

CC: dramati

21 Disemba 2007 16:07

smy
Idadi ya ujumbe: 2481
dramati, could you have a look at here one more time please?

CC: dramati