In that first phase the following works will be financed by the project:
Complete Civil construction of the capture and elevation system for untreated water, installation of the equipment and deployment of an untreated water conduit of 110 litres/sec;
Civil construction and installation of the equipment from the first phase of the treatment station, of the elevator, of the two first cells from a 5,000 m3 reservoir with its respective maneuvering chamber and installation of the equipment;