Мова, якою перекладати: Англійська
The client’s visit in the morning. The issues discussed were as follows:
1. The depth of the foundations and the conclusions of the municipality.
2. The installation of a water supply system in the garage at the yard gate.
3. The removal of the radiators, bathtubs and sinks being carried out by others was discussed.
4. A trench should be dug in order to install the water supply system in the garage.
6 cubic meters of concrete have been brought.
Pavel’s visit in the afternoon:
1. Laying of concrete blocks onto the foundations was discussed.
A neighbour had come, worried about the beaten grass.