The client’s visit in the morning. The issues discussed were as follows: 1. The depth of the foundations and the conclusions of the municipality. 2. The installation of a water supply system in the garage at the yard gate. 3. The removal of the radiators, bathtubs and sinks being carried out by others was discussed. 4. A trench should be dug in order to install the water supply system in the garage. 6 cubic meters of concrete have been brought. Pavel’s visit in the afternoon: 1. Laying of concrete blocks onto the foundations was discussed. A neighbour had come, worried about the beaten grass.